Click on any image for a larger view.
| Road bed preperation. |
 |
Posts sunk deep into clay to support bridges. |
 |
| Bent installation on south approach to the loop. |
 |
Trackwork installed on trestle. |
 |
| Lower bridge installation. |
 |
Upper brigde bents installed. |
 |
| Ballast tamping on lead from Oxford. |
 |
Trackwork along bridge. |
 |
| Installation of new switch in Lake Orion to divert mainline to new loop. |
 |
Installation of switch at the Oxford end of new loop. |
 |
| |
|
|
|