The Michigan Central Railroad

Construction of Woods Pond Loop

Click on any image for a larger view.

Road bed preperation. Posts sunk deep into clay to support bridges.
Bent installation on south approach to the loop. Trackwork installed on trestle.
Lower bridge installation. Upper brigde bents installed.
Ballast tamping on lead from Oxford. Trackwork along bridge.
Installation of new switch in Lake Orion to divert mainline to new loop. Installation of switch at the Oxford end of new loop.